Section 1: Real estate
Section 2: Energy
Section 3: Infrastructure and transportation
Section 4: Real estate
Section 5: Enterprise
Legend:
Revenue-ready: The asset or business is in operations and generating revenues.
Pre-revenue: Applicable to start-ups only at the Seed or Series A capital raise stage
Shovel-ready: All procurement, permits and license are completed and in-hand. Ready to build
Design-ready: Concept design, environmental studies, stakeholder engagement are completed
New development: Preliminary economic assessment (PEA) and pre-feasibility study are completed.
Section 1 Real Estate
2450 United States – Resilience Innovation Hub
$50M debt and/or equity financing
Shovel-ready
American-based project ecosystem designed to get development projects (real estate and infrastructure) permitted, insured, and financed in regions that are subject to severe environmental constraints that become otherwise impossible to insure and finance independently. The investment will be placed in a capital fund used to enable specific projects to overcome the regulatory obstacles that are spreading across the country to block development projects.
2446 Mayan Riviera – Wellness resort development
$5M equity financing
Shovel-ready
This project, titled Alumina Tulum, will construct a beachfront (30m) luxury resort with 43 luxury suites designed and constructed to provide an immersive wellness experience throughout the areas of the property. The project is already 80% financed and requires the final $5M to initiate construction.
2440 Cayman Islands – Georgetown Entertainment District development
$100M debt and/or financing
Shovel-ready
This project is limited to the land and building purchases for the project, which will be located on Seven Miles beach, on Grand Cayman. Land costs will be $74M for 16.2 acres (including ocean front location). Building presently exists and will be purchased for $26M.
2441 Cayman Islands – Georgetown Entertainment District development
$440M debt and/or financing
Shovel-ready
In partnership with Universal Music Group and UMusic Hotels, project owner will develop an Entertainment District that will feature a 10,000 seat arena, a 375 suite music themed experiential hotel, The Cayman Convention Centre, 170,000 sq ft of retail and a 60’ wide oceanside boardwalk. Feasibility and environmental studies are completed.
2433 Canada – Multi-purpose rental tower development
$14M equity financing
Shovel-ready
Multi-residential purpose-built rental tower aiming to redefine rental standards for young professionals. The project is located in Ottawa, Canada and includes state-of-the-art coworking space, a pet spa, hair and nail salon, and a curated
collection of signature amenities and features designed with the modern renter in mind and for the evolution and growth of residents.
Section 2 Energy
2431 Canada and USA – Green Hydrogen production plants
$148M Debt financing
Shovel-ready
Publicly traded corporation focused on the design, construction, and operation of hydrogen production plants powered from renewal electricity sources. Investment program includes 16 projects to be developed by 2030 and totalling $640M USD. The first two projects of the program, included in this opportunity, will be located in Sorel (Canada) and Detroit (USA), each producing 10 tonnes per day. Each project is being developed in five phases between March 24 and December 26, with a combined budget of $232M USD and a financing of $148M USD.
Section 3 Infrastructure
2406 Colombia – Santa Marta international airport expansion
$400M Debt financing or PPP structure
New development
The Santa Marta municipal district, in partnership with the National government, wishes to develop a significant capacity expansion of the existing Simon Bolivar International Airport. This project is inscribed in the decadal development plan of the city to mark the 500th anniversary of its founding in 1524.
2372 Mexico – Cruise ship port development in Cabo San Luca
$280M – Debt financing, up to 49% equity
New development
A privately-owned and operated cruise ship port is proposed for the resort town of Cabo San Luca, developed in partnership with Royal Caribbean cruises.
2358 Canada – Privately-owned international airport development
$495M – Debt financing, up to 20% equity
Design ready
Company acquired in the summer 2023 the rights, property, and licenses of the Stephenville airport in Newfoundland. The development program to modernize the existing assets includes 1) $250M terminal; 2) $65M fire station; 3) $105M 1200 person work camp; and 4) $75M floating work camp (cruise ship conversion).
2406 Colombia – Santa Marta municipal water treatment plant
$140M Debt financing or PPP structure
New development
The Santa Marta municipal district, in partnership with the National government, wishes to develop a regional water production and waste treatment plant, using water from the Cordoba River. This project is inscribed in the decadal development plan of the city to mark the 500th anniversary of its founding in 1524.
Section 4 Mining
2435 USA – Coal mine activation
$5M debt financing
Revenue-ready
Operational mine (location undisclosed) seeking to scale up production through the purchase of new mobile and stationary equipment.
2368 Mexico – Gold mine bulk sample project
$20M Gold offtake of 15000 ounces
Shovel-ready
Bulk sample extraction from the Ana Paula deposit in Mexico. The bulk sample will enable the construction of the underground infrastructure to advance the project (still at Feasibility study). Investor injects USD$20M in capital in return for 15,000 ounces of gold at a below market price. Delivery of the physical gold or cash equivalent will be in 16-24months from investment.
2350 Mexico – Gold mine development
$25M Debt financing
Shovel-ready
Expansion of existing mine (15.18 grams per tonne Au, 329 g per tons Ag) and acquisition of land currently being leased. Expansion will add second mill, tailings dam, mining equipment, camp and infrastructure improvements, new permits, and 43-101 completion.
2341 Mexico – Gold mine development
$70M debt financing – up to 25% equity in two tranches: $10M (Phase 1 development and mining), $60M (Phase 2 development and mining)
Shovel-ready
Project anchored to Oposura (Zn, Pb, Ag, Cu) and Alacran (Au, Ag, Cu), both of which are on private land in Sonora, Mexico, and have recently issued NI43-101 technical reports. The Oposura project, near Moctezuma in Sonora is fully permitted for production from the East deposit. Alacran is being actively drilled to expand the low-strip-ratio, heap leachable, oxidized gold and silver mineral resource to upwards of 1 million AuEq ounces. The Copper porphyry targets are the medium-to-long-term growth opportunity on the Alacran property.
Section 5 Enterprise
2456 Norway and Mexico – Thalasso biorefinery plant
$2M equity
Pre-revenue (9 months until commercial roll out)
The start-up, Thalasso, has initiated the construction of a fabrication plant to assemble its proprietary process to convert ocean-polluting sargassum into value added sustainable product lines that include bioplastics & packaging materials, pharmaceutical additives, nutraceutical powders, cosmetics, human and animal-grade proteins, textiles, and fertilizers. Sargassum is a oceanic invasive species that destroys seas and shores, at the present annual rate of 40 million tons that drift onto beaches and coastal shores in the Caribbeans, Mexico, and USA (Florida). This plant is economically destructive now, but represent an immense potential in Canada, Mexico, USA, New Zealand, Australia, Norway, Iceland, Greenland, Sweden, Chile, United Kingdom, Southeast Asia, and West Africa. This funding round is required to complete the fabrication of the modular process containers for immediate use in Mexico.
2452 USA and Italy – Bespoke, made-to-order and sustainable luxury apparel
$2M equity
Pre-revenue
The start-up, Treun House Atelier, has engineered a zero-waste, zero-inventory clothe manufacturing process from farm to fibre to fashion and back, aimed at the luxury casual wear market (clothing and footwear). The on-demand manufacturing is already operating in the US, with original materials sourced from classic Italian suppliers. A second on-demand shop will be established in Italy in immediate proximity to the materiel suppliers. Treun is looking for two successive equity raises of $500K and $1.5M. The $500K will cover the immediate costs for materiel sourcing, production set-up and initial production runs, packaging, marketing, and distribution framework. The $1.5M will expand on the same cost items and add staffing increases and Italian location development. The $8M debt financing will be used to stand up the Italian location and expand the Brand’s presence in Europe.
2451 USA – Medical treatment development to cure autoimmunity ailments
$15M equity financing
Pre-revenue
Cytokind is a start-up focused on solving systemic inflammation at the root of autoimmunity conditions, a problem that affects 50 million persons annually in the US. The solution is anchored to metabolites, naturally produced by the body to fight inflammation. The technology development will centre around ultraviolet B (NB-UVB) phototherapy has been shown to reduce inflammation and improve patient outcomes. The research will target the discovery of the metabolites that are precisely stimulated by the phototherapy.
2436 USA and Canada – Consumer product roll-out
$1M equity financing
Pre-revenue
The start-up, Wize Sparkling Iced Tea, proposes to roll-out a new entrant in the canned iced tea market. The product, currently available in three flavours (apple, raspberry, mango) is made from 100% arabica coffee leaves (the ONLY commercial drink made from coffee leaves). Product contains 10% of the sugar contents of other canned products, ¼ of the caffeine of canned caffeinated beverages, and strong antioxidants (Mangiferin, EGCG, Theobromine and Chlorogenic Acids). Funds will be allocated to production, HR, sales, and marketing campaigns.
2410 USA – Fairshare start-up market expansion
$10M equity financing
Pre-revenue
The start-up, Fairshare pop commerce, has developed an online platform to monetize the widespread practice of content sharing on the internet. The platform creates a free-flowing market for the exchange of goods, services, ideas, and knowledge, through which every sharing action (by individuals and corporations) results in an automatic commission payment to the action’s initiator, once a sale results from this chain of shares.
2401 England – London diamond & emerald fine jewellery expansion
$62M equity raise through convertible notes, in two tranches: $12M and $50M
Revenue-ready
The Company is offering the opportunity for investors to subscribe for loan notes in London DE Ltd as part of its expansion programme. The capital will be raised to enhance its position in the market by increasing its bulk purchasing of loose gemstones and gold.
2352 Canada – Novus TX non-surgical brain damage healing technology
$2M equity financing
Pre-revenue
Novel technology utilizing focused ultrasound beams to diagnose and treat brain damages. Application is topical and eliminates the costly surgical neurostimulation treatment current in used across North America. The patented biaxial technique alters the shape of the ultrasound beam with few elements, thus producing precise, depth-penetrating ultrasounds within extreme resolution. The technology is suitable for walk-in clinics, at a fraction of the costs of a traditional surgically based neurostimulation. Technology has reached TRL level 6 and require additional investment to develop pre-production full scale system and pursue diagnostic certification from Health Canada. Corresponding FDA certification for the US will follow once Canadian certification is achieved.
2351 Canada – Biowave instruments start-up
$1.5M equity financing
Pre-revenue
Biowave has developed a hand-held wand technology to detect skin cancer through focused ultrasound. Technology has reached TRL level 6 and require additional investment to develop pre-production full scale system and pursue diagnostic certification from Health Canada. Corresponding FDA certification for the US will follow once Canadian certification is achieved.
2238 United States – BARU shared-economy manufacturing.
$3 to $5M equity injection – immediate opportunity
Revenue-ready
Baru has developed an internet-based network of wood and robotic workshops whose idle periods can be monopolized on a just-in-time basis to locally manufacture furniture closest to the individual buyer, eliminating in the process 70% of the non-value-added global supply chain and transportation costs.
2319 United States – On-demand regional air mobility aircraft
$25M equity or debt financing
Pre-revenue
Development program of a light, quiet, and extreme-efficiency commuter aircraft platform. Financing sought to design and fabricate the 4th and 5th aircraft prototypes to initiate the FAA type certification process.